In the complex world of property development and custom building, the foundation of a successful project isn’t just laid with concrete and steel—it’s laid with a sound Construction Delivery Method (CDM).
For homeowners, investors, and developers in Adelaide, understanding how your builder structures a project is crucial. The chosen delivery method dictates the flow of design, procurement, and construction, directly impacting your project’s cost, timeline, and quality.
At Deep Constructions, where we blend meticulous craftsmanship with expert project management, we know that expertise in CDMs is non-negotiable. It’s why continuous Construction Delivery Methods Training is a pillar of our operational excellence.
A Construction Delivery Method is the framework or contractual arrangement used to organize the project team and define the roles, responsibilities, and relationships between the Owner (you), the Designer, and the Builder.
Choosing the right method is the critical first step in defining your project’s risk profile, budget certainty, and schedule control.
While there are many variations, most construction projects utilize one of three core delivery methods. Expert training ensures a project manager can navigate the nuances of each to advise a client properly.
This is the traditional, sequential approach.
Process: The owner first hires a designer (architect/engineer) to complete 100% of the design. Once designs are complete, the project is put out to bid (tenders), and the owner selects a builder.
Best For: Simple, straightforward projects where the scope is fully defined upfront and cost certainty is prioritized (often governmental or standard commercial builds).
The Training Focus: Training emphasizes meticulous contract documentation and scope definition to prevent conflicts and costly change orders during the construction phase.
The integrated, single-point-of-contact approach.
Process: The owner contracts with a single entity (the Design-Builder, like Deep Constructions), who is responsible for both the design and construction.
Advantages: This method offers the fastest delivery time and maximum collaboration. The designer and builder work together from Day One, leading to greater innovation and cost-saving suggestions (value engineering) during the design phase.
Why We Prioritize It: This aligns perfectly with our bespoke approach. It creates a truly Collaborative Partnership, ensuring the final design is inherently buildable and budget-aware.
The Training Focus: Training centers on seamless team integration, risk management under one contract, and transparent client communication throughout the accelerated timeline.
This approach brings an expert in construction logistics onto the team early to act as an agent for the owner. There are two main types:
Agency CM: The CM acts solely as an advisor, managing the schedule and quality, while the owner still holds contracts with all trade contractors.
CM at-Risk (CMAR): The CM commits to delivering the project within a Guaranteed Maximum Price (GMP). The CMAR acts as a consultant during the design phase, then as the general contractor during the build phase.
Best For: Large-scale, complex projects (like multi-unit developments or specialised commercial builds such as Childcare Centre Construction) where a high level of expertise is required early on.
The Training Focus: Training focuses on advanced cost estimating, trade contractor pre-qualification, and rigorous schedule management to protect the GMP.
For builders, continuous training in delivery methods isn’t just about learning definitions—it’s about learning strategy.
A project manager who is trained in these methods can:
Optimize Time and Cost: They can look at a client’s specific goals and recommend the most efficient method. For instance, recommending Design-Build for a time-sensitive custom home allows construction to begin before the final design is complete for certain elements.
Mitigate Risk: Understanding contract structures helps Deep Constructions manage liability and provide appropriate warranties, offering the client greater security.
Ensure Quality: Training reinforces the necessary checkpoints and QA protocols unique to each method. In a CMAR scenario, training ensures all trade packages meet the GMP while maintaining Deep Constructions’ standard of Unrivaled Craftsmanship.
Ultimately, our team’s deep expertise ensures that whether you are commissioning a bespoke custom home or overseeing a high-yield multi-unit project, the right delivery method is selected and flawlessly executed. We transform architectural concepts into living environments that are not only beautiful but also robust and enduring.
Don’t leave the most important decision about your project—the delivery method—to chance.